Allied Telesis AT-FH708E Installation Guide Page 31

  • Download
  • Add to my manuals
  • Print
  • Page
    / 51
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 30
AT-FH708E V2 Installation Guide
17
7. Attach the data cables to the hub ports. Do
not use crossover cables to connect
workstations or servers to ports 1 through 8.
Do not use a crossover cable to connect a
switch, hub, or router to the Uplink port.
Note
You can use either port 8 or the Uplink
port. You cannot use both ports
simultaneously.
8. Go to the procedure “Verifying and
Troubleshooting the Installation on page 17.
Verifying and Troubleshooting the
Installation
The following procedure should be perform
after you have initially installed the unit to
check to be sure that the device is operating
properly. You can also perform this procedure
to troubleshoot the unit in the event you
experience any problems with the device.
1. Check the Power LED. The LED should be
ON. If the LED is OFF, check the following:
Verify that the power adapter is securely
connected to the power source and to the
DC connector on the front of the AT-
FH708E V2 unit.
Page view 30
1 2 ... 26 27 28 29 30 31 32 33 34 35 36 ... 50 51

Comments to this Manuals

No comments