Allied Telesis AT-GS950/16-10 User Manual Page 30

  • Download
  • Add to my manuals
  • Print
  • Page
    / 44
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 29
Chapter 2: Installation
30
Unpacking the Switch
To unpack the switch, perform the following procedure:
1. Remove all components from the shipping package.
Note
Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesis.
2. Place the switch on a level, secure surface.
3. Verify that the following hardware components are included in your
switch package. If any item is missing or damaged, contact your Allied
Telesis sales representative for assistance.
One AT-GS950/16 or AT-GS950/24 Smart Switch
Two rack-mount brackets
Eight rack-mount bracket screws (black)
Four rack-mounting screws (stainless steel)
Four rubber feet (for desktop use)
One management cable
One power cord
Documentation CD
Page view 29
1 2 ... 25 26 27 28 29 30 31 32 33 34 35 ... 43 44

Comments to this Manuals

No comments