Allied Telesis AT-GS950/16 Installation Guide Page 30

  • Download
  • Add to my manuals
  • Print
  • Page
    / 50
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 29
Chapter 2: Installation
30
Unpacking the Switch
To unpack the switch, perform the following procedure:
1. Remove all of the components from the shipping package.
Note
Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesis.
2. Place the switch on a level, secure surface.
3. Verify that the shipping container includes the items listed in Figure 5
on page 30 in addition to your AT-GS950/8, AT-GS950/16, AT-GS950/
24 or AT-GS950/48 switch.
Figure 5. AT-GS950/xx Packing List
Two equipment rack or
wall brackets
Eight bracket screws
Four wall anchors
Four wall screws
Four rubber feet (for
desktop installation)
One regional AC power
cord
Two or four SFP slot dust
covers (pre-installed).
Page view 29
1 2 ... 25 26 27 28 29 30 31 32 33 34 35 ... 49 50

Comments to this Manuals

No comments