Allied Telesis AT GS900/5E User Manual Page 26

  • Download
  • Add to my manuals
  • Print
  • Page
    / 40
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 25
Chapter 2: Installation
26
Unpacking the Switch
To unpack an AT-GS900/16 or an AT-GS900/24 switch, perform the
following procedure:
1. Remove all components from the shipping package.
Note
Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesis.
2. Place the switch on a level, secure surface.
3. Ensure the following hardware components are included in your switch
package. If any item is missing or damaged, contact your Allied
Telesis sales representative for assistance.
One AT-GS900/16 or AT-GS900/24 Fanless Gigabit Ethernet
switch
Two rackmounting brackets
Eight flathead Phillips screws
Four #10-32 Phillips screws with a nylon washer
Four self-adhesive rubber feet
AC power cord
Documentation CD
Page view 25
1 2 ... 21 22 23 24 25 26 27 28 29 30 31 ... 39 40

Comments to this Manuals

No comments