Allied Telesis Rapier G6F-SC Installation Guide Page 5

  • Download
  • Add to my manuals
  • Print
  • Page
    / 7
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 4
Quick Install Guide 5
C613-04022-01 REV E
Figure 1: Removing a blank face-plate.
6. Prepare the Uplink Module
In an antistatic environment, remove the Uplink Module from its packing
material. Be sure to observe ESD precautions.
Do not attempt to install an Uplink Module or any other expansion option
without observing correct antistatic procedures. Failure to do so may damage
the switch unit or Uplink Module. If you are unsure what the ‘correct’
procedures are, contact your authorised Allied Telesyn distributor or reseller.
7. Slide the Uplink Module into place
Make sure that the module is aligned with the card guides on each side of
the bay (see Figure 2).
Figure 2: Installing an Uplink Module.
8. Secure the Uplink Module to the switch unit
Firmly press the Uplink Module until its connectors engage the uplink bay
connectors inside the switch unit.
Use a screwdriver to tighten the Uplink Module’s screws. Do not
over-tighten the screws.
9. Apply AC power to the switch unit
Plug the power cord into the switch unit’s rear panel. The switch’s Fault
LED should flash for approximately 10 seconds as it runs internal tests.
10. If you disconnected a redundant power supply in step 3, reconnect it
A
B
A
B
A
T
-A
3
5/S
X
1
0
00
B
A
S
E
-F
X
/S
C
RX
TX
LINK
ACTIVITY
FULL DUP
HALF DUP
COL
LINK
ACTIVITY
FULL DUP
HALF DUP
COL
COL
Card Guide
Page view 4
1 2 3 4 5 6 7

Comments to this Manuals

No comments