613-001935 Rev. BSwitchBlade x8106Layer 3+ Chassis SwitchAT-SBx81CFC960Controller Fabric Card AT-SBx8106 Chassis AT-SBx81GT24 Ethernet Line Card AT
List of Figures10Figure 50: Verifying the AT-SBxPWRSYS1 Power Supply...
Chapter 5: Installing the Chassis in an Equipment Rack100 Section II: Installing the ChassisInstalling the Chassis in the Equipment RackThe procedure
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 1012. Lift the AT-SBx8106 Chassis into t
Chapter 5: Installing the Chassis in an Equipment Rack102 Section II: Installing the ChassisFigure 39. Installing the Rack Mount Screws5. Tighten all
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 103Figure 40. Tightening the Rack Mount
Chapter 5: Installing the Chassis in an Equipment Rack104 Section II: Installing the ChassisRemoving the Shipping BraceNow that the chassis is install
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 105Installing the Chassis Grounding Wire
Chapter 5: Installing the Chassis in an Equipment Rack106 Section II: Installing the Chassis3. Insert one end of the grounding wire into the grounding
107Chapter 6Installing the Power SuppliesThis chapter explains how to install the power supplies. It has the following sections: “Protecting Against
Chapter 6: Installing the Power Supplies108 Section II: Installing the ChassisProtecting Against Electrostatic Discharge (ESD)To protect the equipment
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 109Installing the AT-SBxPWRSYS1 AC Syste
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation Guide11Figure 110: Removing the Dust Cover from an SFP+ Transceiver in the AT-SB
Chapter 6: Installing the Power Supplies110 Section II: Installing the ChassisFigure 48. Removing the Blank Slot Cover from Power Supply Slot C3. Remo
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 111Figure 49. Items Included with the AT
Chapter 6: Installing the Power Supplies112 Section II: Installing the Chassis4. Check the power supply for its model name, shown in Figure 50, to ver
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 1136. Align and insert the AT-SBxPWRSYS1
Chapter 6: Installing the Power Supplies114 Section II: Installing the Chassis7. Lower the power supply locking handle to secure the power supply to t
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 115Installing the AT-SBxPWRPOE1 PoE Powe
Chapter 6: Installing the Power Supplies116 Section II: Installing the ChassisFigure 54. Removing the Blank Slot Cover from Power Supply Slot A3. Remo
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 117Figure 55. Items Included with the AT
Chapter 6: Installing the Power Supplies118 Section II: Installing the Chassis4. Check the model name, shown in Figure 56, to verify the module.If the
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 119Figure 58. Inserting the AT-SBxPWRPOE
List of Figures12Figure 170: Loosening the AT-SBxFAN06 Fan Module from the Backplane Connector... 254F
Chapter 6: Installing the Power Supplies120 Section II: Installing the Chassis7. Lower the locking handle of the power supply module to secure the mod
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 121Installing the AT-SBxPWRSYS1 DC Syste
Chapter 6: Installing the Power Supplies122 Section II: Installing the ChassisFigure 60. Removing the Blank Slot Cover from Power Supply Slot C3. Remo
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 123Figure 61. Items Included with the AT
Chapter 6: Installing the Power Supplies124 Section II: Installing the ChassisFigure 62. On/Off Switch on the AT-SBxPWRSYS1 DC Power Supply5. With a #
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 125Figure 64. Raising Handle on the AT-S
Chapter 6: Installing the Power Supplies126 Section II: Installing the Chassis8. Lower the locking handle of the power supply module to secure the mod
127Chapter 7Installing the AT-SBx81CFC960 Controller and Ethernet Line CardsThis chapter describes how to install the controller and Ethernet line car
Chapter 7: Installing the AT-SBx81CFC960 Controller and Ethernet Line Cards128 Section II: Installing the ChassisGuidelines to Handling the Controller
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 129Figure 67. Aligning a Card in a Slot
13Table 1. AT-SBxPWRSYS1 Power Supply LEDs ...
Chapter 7: Installing the AT-SBx81CFC960 Controller and Ethernet Line Cards130 Section II: Installing the ChassisInstalling the AT-SBx81CFC960 Control
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 131Figure 69. Items Included with the AT
Chapter 7: Installing the AT-SBx81CFC960 Controller and Ethernet Line Cards132 Section II: Installing the ChassisFigure 71. Removing the Battery Insul
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 133Figure 73. Aligning the AT-SBx81CFC96
Chapter 7: Installing the AT-SBx81CFC960 Controller and Ethernet Line Cards134 Section II: Installing the ChassisFigure 74. Closing the Locking Levers
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 135Figure 75. Tightening the Thumb Screw
Chapter 7: Installing the AT-SBx81CFC960 Controller and Ethernet Line Cards136 Section II: Installing the ChassisInstalling the Ethernet Line CardsThi
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 1373. Carefully remove the Ethernet line
Chapter 7: Installing the AT-SBx81CFC960 Controller and Ethernet Line Cards138 Section II: Installing the Chassis5. Slowly and carefully slide the car
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 139Figure 80. Tightening the Thumb Screw
List of Tables14
Chapter 7: Installing the AT-SBx81CFC960 Controller and Ethernet Line Cards140 Section II: Installing the ChassisInstalling the Blank Slot CoversAfter
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 141Allied Telesis recommends tightening
Chapter 7: Installing the AT-SBx81CFC960 Controller and Ethernet Line Cards142 Section II: Installing the Chassis
143Chapter 8Installing the Transceivers and Cabling the PortsThis chapter describes how to install the fiber optic transceivers and attach the cables
Chapter 8: Installing the Transceivers and Cabling the Ports144 Section II: Installing the ChassisCabling Guidelines for the Twisted Pair Ports on the
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 145 The default wiring configuration of
Chapter 8: Installing the Transceivers and Cabling the Ports146 Section II: Installing the ChassisFigure 84. Connecting Cables to Ports on the AT-SBx8
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 147Guidelines to Installing SFP and SFP+
Chapter 8: Installing the Transceivers and Cabling the Ports148 Section II: Installing the ChassisInstalling SFP Transceivers in the AT-SBx81GS24a Lin
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 1493. To install the transceiver in an S
15PrefaceThis guide contains the hardware installation instructions for the Layer 3+ SwitchBlade x8106 Chassis Switch. The preface contains the follow
Chapter 8: Installing the Transceivers and Cabling the Ports150 Section II: Installing the ChassisFigure 88. Removing the Dust Cover from the SFP Tran
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 1517. Connect the fiber optic cable to t
Chapter 8: Installing the Transceivers and Cabling the Ports152 Section II: Installing the ChassisInstalling SFP+ Transceivers in the AT-SBx81XS6 Line
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 153Figure 92. Handle on SFP+ Transceiver
Chapter 8: Installing the Transceivers and Cabling the Ports154 Section II: Installing the ChassisFigure 94. Removing the Dust Cover from an SFP+ Tran
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 1556. Connect the fiber optic cable to t
Chapter 8: Installing the Transceivers and Cabling the Ports156 Section II: Installing the ChassisInstalling AT-SP10TW Cables in the AT-SBx81XS6 Line
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 157Figure 98. Release Tab on the AT-SP10
Chapter 8: Installing the Transceivers and Cabling the Ports158 Section II: Installing the ChassisNoteTo remove the connector and cable from the SFP+
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 159Installing SFP+ Transceivers in the A
Preface16Structure of the Installation GuideThis guide has the following three sections: Section I: Hardware OverviewThe chapters in this section des
Chapter 8: Installing the Transceivers and Cabling the Ports160 Section II: Installing the ChassisFigure 101. Installing a Transceiver in the AT-SBx81
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 161NoteThe dust cover protects the fiber
Chapter 8: Installing the Transceivers and Cabling the Ports162 Section II: Installing the ChassisFigure 104. Attaching a Fiber Optic Cable to a Trans
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 163Installing AT-SP10TW Cables in the AT
Chapter 8: Installing the Transceivers and Cabling the Ports164 Section II: Installing the Chassiseven numbered slot, position the connector so that t
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 165Cabling the NET MGMT Port on the AT-S
Chapter 8: Installing the Transceivers and Cabling the Ports166 Section II: Installing the ChassisAfter cabling the NET MGMT port, do one of the follo
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 167Installing SFP+ Transceivers in the A
Chapter 8: Installing the Transceivers and Cabling the Ports168 Section II: Installing the Chassis2. If you are installing the SFP+ transceiver in slo
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 169Figure 110. Removing the Dust Cover f
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation Guide17Safety Symbols Used in this DocumentThis document uses the following conv
Chapter 8: Installing the Transceivers and Cabling the Ports170 Section II: Installing the ChassisFigure 112. Attaching a Fiber Optic Cable to an SFP+
171Chapter 9Powering On the ChassisThis chapter describes how to power on the chassis and monitor the initialization process. The chapter contains the
Chapter 9: Powering On the Chassis172 Section II: Installing the ChassisVerifying the InstallationPlease perform the following procedure before poweri
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 173Powering On the AT-SBxPWRSYS1 AC Syst
Chapter 9: Powering On the Chassis174 Section II: Installing the ChassisFigure 114. Connecting the AC Power Cord for the AT-SBxPWRSYS1 AC Power Supply
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 175Figure 115. Securing the Power Cord f
Chapter 9: Powering On the Chassis176 Section II: Installing the ChassisPowering On the AT-SBxPWRPOE1 Power SupplyIf you have not already installed th
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 1773. Use the twist tie that comes with
Chapter 9: Powering On the Chassis178 Section II: Installing the ChassisFigure 118. Dress and Secure AC Power Cords6. Go to “Monitoring the Initializa
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 179Powering On the AT-SBxPWRSYS1 DC Syst
Preface18Contacting Allied TelesisIf you need assistance with this product, you may contact Allied Telesis technical support by going to the Support &
Chapter 9: Powering On the Chassis180 Section II: Installing the ChassisThe components of the power supply are identified in Figure 119.Figure 119. Co
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 181Choosing aMethod forAttaching theGrou
Chapter 9: Powering On the Chassis182 Section II: Installing the Chassis3. Use an 8 mm wrench to remove the grounding post nut and washer, shown in Fi
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 183Figure 124. Installing the Grounding
Chapter 9: Powering On the Chassis184 Section II: Installing the ChassisConnecting theGrounding Wirewith Bare WireTo attach the grounding wire to the
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 1854. Secure the wire with the nut and w
Chapter 9: Powering On the Chassis186 Section II: Installing the ChassisChoosing aMethod forAttaching thePower WiresThe AT-SBxPWRSYS1 DC Power Supply
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 187Figure 129. Stripping the Power Wires
Chapter 9: Powering On the Chassis188 Section II: Installing the ChassisFigure 131. On/Off Switch on the AT-SBxPWRSYS1 DC Power Supply4. Use a #1 Phil
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 189Figure 132. Opening the Plastic Cover
19Section IHardware OverviewThis section contains the following chapters: Chapter 1, “Chassis and Power Supplies” on page 21 Chapter 2, “Ethernet Li
Chapter 9: Powering On the Chassis190 Section II: Installing the ChassisFigure 133. Removing the Terminal Screws6. With a #3 Phillips-head screwdriver
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 191Figure 134. Connecting the Positive (
Chapter 9: Powering On the Chassis192 Section II: Installing the ChassisFigure 135. Connecting the Negative (-) Power Wire with a Straight TerminalWar
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 193Figure 136. Closing the Plastic Cover
Chapter 9: Powering On the Chassis194 Section II: Installing the ChassisFigure 137. Tightening the Handle Locking Screw10. Before attaching the power
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 195Connecting theDC Power Wireswith the
Chapter 9: Powering On the Chassis196 Section II: Installing the Chassis4. Using a #1 Phillips-head screwdriver, remove the two screws that secure the
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 197Figure 141. Removing the Terminal Scr
Chapter 9: Powering On the Chassis198 Section II: Installing the ChassisFigure 142. Connecting the Positive (+) Power Wire with a Right Angle Terminal
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 199Figure 143. Connecting the Negative (
Copyright © 2014 Allied Telesis, Inc. All rights reserved. No part of this publication may be reproduced without prior written permission from Allied
20
Chapter 9: Powering On the Chassis200 Section II: Installing the ChassisFigure 144. Tightening the Handle Locking Screw9. Before attaching the power w
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 201Connecting BareDC Power WiresTo attac
Chapter 9: Powering On the Chassis202 Section II: Installing the ChassisFigure 146. Connecting the Positive Lead Wire5. Wrap the negative lead wire cl
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 203Figure 147. Connecting the Negative L
Chapter 9: Powering On the Chassis204 Section II: Installing the Chassis7. With a #2 Phillips-head screwdriver, tighten the handle locking screw to se
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 205Monitoring the Initialization Process
Chapter 9: Powering On the Chassis206 Section II: Installing the Chassislogin” prompt.Figure 148. Switch Initialization MessagesVerifying release... O
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 207Figure 149. Switch Initialization Mes
Chapter 9: Powering On the Chassis208 Section II: Installing the Chassis
209Chapter 10Verifying the Hardware Operations of the ChassisThis chapter describes how to verify the operations of the chassis. The chapter contains
21Chapter 1Chassis and Power SuppliesThis chapter describes the Layer 3+ SwitchBlade x8106 Chassis Switch in the following sections: “Introduction” o
Chapter 10: Verifying the Hardware Operations of the Chassis210 Section II: Installing the ChassisUsing the LEDs to Verify the ChassisAfter powering o
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 211prevents them from completing the ini
Chapter 10: Verifying the Hardware Operations of the Chassis212 Section II: Installing the ChassisUsing Local Management to Verify the ChassisThis sec
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 2133. Configure the VT-100 terminal or t
Chapter 10: Verifying the Hardware Operations of the Chassis214 Section II: Installing the Chassis2. Compare the version number displayed by the SHOW
215Chapter 11TroubleshootingThis chapter contains information on how to troubleshoot the SwitchBlade x8106 product.NoteIf you are unable to resolve a
Chapter 11: Troubleshooting216 Section II: Installing the ChassisAT-SBxPWRSYS1 and AT-SBxPWRPOE1 AC Power SuppliesA power supply is operating normally
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 217AT-SBxPWRSYS1 DC Power SupplyIf you s
Chapter 11: Troubleshooting218 Section II: Installing the Chassissoftware version on the control card, refer to “Using Local Management to Verify the
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 219Ethernet Line CardsA quick and easy w
Chapter 1: Chassis and Power Supplies22 Section I: Hardware OverviewIntroductionThe SwitchBlade x8106 product is a modular Layer 3+ Ethernet switch. T
Chapter 11: Troubleshooting220 Section II: Installing the Chassis Use the SHOW CARD command to display card status information, as shown in Figure 15
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 221Twisted Pair PortsThis section applie
Chapter 11: Troubleshooting222 Section II: Installing the Chassis The default speed setting of Auto-Negotiation is not appropriate for ports connecte
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 223Power Over EthernetThis section appli
Chapter 11: Troubleshooting224 Section II: Installing the Chassis Use the SHOW POE CARD command to determine whether the switch has reach its maximum
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 225Fiber Optic or Twisted Pair Transceiv
Chapter 11: Troubleshooting226 Section II: Installing the ChassisAT-SBx81CFC960 Controller Fabric CardIf the chassis has one controller card and the c
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 227AT-SBxFAN06 Fan ModuleThe AT-SBxFAN06
Chapter 11: Troubleshooting228 Section II: Installing the ChassisLocal (Console) Management SessionIf you are unable to establish a local management s
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 229Power Supply Interfaces (Opto-coupler
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 23Figure 3 illustrates the fan module.Figure 3
Chapter 11: Troubleshooting230 Section II: Installing the Chassis
231Chapter 12Replacing ModulesThis chapter contains procedures on how to replace modules in the unit. The chapter contains the following sections: “R
Chapter 12: Replacing Modules232 Section II: Installing the ChassisReplacing AT-SBxPWRSYS1 AC and AT-SBxPWRPOE1 Power SuppliesThis section contains th
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 2332. Lift the locking hand on the power
Chapter 12: Replacing Modules234 Section II: Installing the ChassisFigure 155. Removing the Power Supply from the Chassis4. Do one of the following:
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 235Figure 156. Installing a Blank Power
Chapter 12: Replacing Modules236 Section II: Installing the ChassisFigure 157. Lowering the Locking Handle on the Power Supply Slot Cover
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 237Replacing the AT-SBxPWRSYS1 DC Power
Chapter 12: Replacing Modules238 Section II: Installing the ChassisNoteIf the power wires are connected to the terminal block with the right angle ter
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 239Figure 160. Removing the Negative Lea
Chapter 1: Chassis and Power Supplies24 Section I: Hardware OverviewAT-SBx8106 ChassisThe AT-SBx8106 Chassis is a 4RU unit with slots for four Etherne
Chapter 12: Replacing Modules240 Section II: Installing the ChassisFigure 161. Removing the Positive Lead Wire from the Terminal Block7. Reinstall the
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 241Figure 162. Reinstalling the Screws o
Chapter 12: Replacing Modules242 Section II: Installing the ChassisFigure 163. Closing the Plastic Cover9. Use an 8 mm wrench to remove the grounding
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 243Figure 164. Removing the Grounding Wi
Chapter 12: Replacing Modules244 Section II: Installing the ChassisFigure 165. Reinstalling the Nut and Washer on the Grounding Post11. Lift the locki
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 245Figure 166. Lifting the Locking Handl
Chapter 12: Replacing Modules246 Section II: Installing the ChassisFigure 167. Installing a Blank Power Supply Slot Cover14. Lower the locking handle
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 247Figure 168. Lowering the Locking Hand
Chapter 12: Replacing Modules248 Section II: Installing the ChassisReplacing Ethernet Line CardsThis section contains the procedure for replacing Ethe
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 249instructions, refer to “Installing th
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 25Figure 5. Rear View of the AT-SBx8106 Chassi
Chapter 12: Replacing Modules250 Section II: Installing the ChassisReplacing the AT-SBx81CFC960 Controller Fabric CardThis section contains the proced
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 251NoteYou should not replace a controll
Chapter 12: Replacing Modules252 Section II: Installing the Chassis7. Store the controller card in an anti-static bag.8. Return the card to its shippi
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 253Replacing the AT-SBxFAN06 Fan ModuleT
Chapter 12: Replacing Modules254 Section II: Installing the ChassisFigure 169. Loosening the Screw on the AT-SBxFAN06 Fan Module3. Carefully pull on t
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 2554. Slowly pull the module out 25 mm (
Chapter 12: Replacing Modules256 Section II: Installing the ChassisFigure 172. Removing the AT-SBxFAN06 Fan Module from the ChassisInstalling a NewAT-
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 257Figure 173. Installing a New AT-SBxFA
Chapter 12: Replacing Modules258 Section II: Installing the ChassisFigure 174. Securing the AT-SBxFAN06 Fan Module on the Backplane Connector3. With a
259Chapter 13Upgrading the Controller Fabric CardThis chapter contains the procedure for upgrading the AT-SBx8106 Chassis from the AT-SBx81CFC400 Cont
Chapter 1: Chassis and Power Supplies26 Section I: Hardware OverviewSlots for the Ethernet Line and Controller CardsThe chassis has slots for four Eth
Chapter 13: Upgrading the Controller Fabric Card260 Section II: Installing the ChassisBefore You BeginThe instructions in this chapter explain how to
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 261Card in the chassis has a feature lic
Chapter 13: Upgrading the Controller Fabric Card262 Section II: Installing the ChassisUpgrading the Controller Fabric CardThis section contains step-b
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 2637. Power off the chassis.8. Remove th
Chapter 13: Upgrading the Controller Fabric Card264 Section II: Installing the Chassiscontroller card. The name can be the same as or different from t
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 265refer to the Software Reference for S
Chapter 13: Upgrading the Controller Fabric Card266 Section II: Installing the Chassis
267Section IIIBuilding a Stack with VCStack PlusThis section contains the following chapters: Chapter 14, “VCStack Plus Overview” on page 269 Chapte
268
269Chapter 14VCStack Plus OverviewThis chapter contains a brief overview of the VCStack Plus feature. For more information, refer to the Software Refe
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 27Slots for the Power SuppliesThe chassis has
Chapter 14: VCStack Plus Overview270 Section III: Building a Stack with VCStack PlusOverviewThe VCStack Plus feature is an optional feature for the AT
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection III: Building a Stack with VCStack Plus 271Stack Trunk and Stacking
Chapter 14: VCStack Plus Overview272 Section III: Building a Stack with VCStack PlusVCStack Plus feature. The stacking transceivers must be connected
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection III: Building a Stack with VCStack Plus 273Cabling Configurations f
Chapter 14: VCStack Plus Overview274 Section III: Building a Stack with VCStack PlusTwo ControllerCards PerChassisFigure 177 illustrates the wiring co
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection III: Building a Stack with VCStack Plus 275transceiver in SFP+ slot
Chapter 14: VCStack Plus Overview276 Section III: Building a Stack with VCStack PlusVCStack Plus Feature LicenseA key component of the stack is the VC
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection III: Building a Stack with VCStack Plus 277Optional Feature License
Chapter 14: VCStack Plus Overview278 Section III: Building a Stack with VCStack PlusChassis ID NumbersThe switches in the stack have to be assigned ID
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection III: Building a Stack with VCStack Plus 279Priority NumbersThe swit
Chapter 1: Chassis and Power Supplies28 Section I: Hardware OverviewAT-SBxPWRSYS1 AC Power SupplyThe AT-SBxPWRSYS1 AC Power Supply, shown in Figure 9,
Chapter 14: VCStack Plus Overview280 Section III: Building a Stack with VCStack Plusoptional. If you choose not to set the value, the controller cards
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection III: Building a Stack with VCStack Plus 281Stacking GuidelinesHere
Chapter 14: VCStack Plus Overview282 Section III: Building a Stack with VCStack Plus
283Chapter 15Building a StackThis chapter contains step-by-step instructions on how to configure the switches to build a stack with the VCStack Plus f
Chapter 15: Building a Stack284 Section III: Building a Stack with VCStack PlusBefore You BeginPlease review the following information before you begi
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection III: Building a Stack with VCStack Plus 285Displaying the Managemen
Chapter 15: Building a Stack286 Section III: Building a Stack with VCStack Pluswriting the information, go to “Activating the VCStack Plus Feature Lic
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection III: Building a Stack with VCStack Plus 287Activating the VCStack P
Chapter 15: Building a Stack288 Section III: Building a Stack with VCStack PlusNoteIf the chassis has two controller cards, the active controller auto
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection III: Building a Stack with VCStack Plus 289Enabling the Stacking Fe
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 29DCSolid Green The power supply is providing
Chapter 15: Building a Stack290 Section III: Building a Stack with VCStack Plus3. Enter the EXIT command to return to the Privileged Exec mode.awplus(
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection III: Building a Stack with VCStack Plus 291Displaying the Feature L
Chapter 15: Building a Stack292 Section III: Building a Stack with VCStack Plusthe first chassis. If the two chassis have the same licenses and enable
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection III: Building a Stack with VCStack Plus 293Setting the ID NumberThe
Chapter 15: Building a Stack294 Section III: Building a Stack with VCStack Plusconfiguring the first switch of the stack and want to assign it the num
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection III: Building a Stack with VCStack Plus 2955. After changing the ID
Chapter 15: Building a Stack296 Section III: Building a Stack with VCStack PlusFigure 187. SHOW STACK Command7. Verify the pending ID number change.Ea
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection III: Building a Stack with VCStack Plus 297Setting the Priority Num
Chapter 15: Building a Stack298 Section III: Building a Stack with VCStack PlusPowering Off the ChassisNow that you have configured the chassis, you s
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection III: Building a Stack with VCStack Plus 299Configuring the Second C
3Electrical Safety and Emissions StandardsThis product meets the following standards.EMI/RFI Emissions: FCC Class A, EN55022 Class A, EN61000-3-2, EN6
Chapter 1: Chassis and Power Supplies30 Section I: Hardware OverviewAT-SBxPWRPOE1 Power SupplyThe AT-SBxPWRPOE1 Power Supply, shown in Figure 10, prov
Chapter 15: Building a Stack300 Section III: Building a Stack with VCStack PlusInstalling and Cabling the Stacking TransceiversFor background informat
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection III: Building a Stack with VCStack Plus 301Figure 190. Installing t
Chapter 15: Building a Stack302 Section III: Building a Stack with VCStack PlusFigure 192. Positioning the Handle on the Transceiver6. Connect the fib
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection III: Building a Stack with VCStack Plus 303Powering On the StackThe
Chapter 15: Building a Stack304 Section III: Building a Stack with VCStack Plusso that its active master controller card becomes the active card for t
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection III: Building a Stack with VCStack Plus 305Figure 194. Initializati
Chapter 15: Building a Stack306 Section III: Building a Stack with VCStack PlusFigure 195. Initialization Messages for the Stack (Continued)Received e
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection III: Building a Stack with VCStack Plus 307Verifying the StackAfter
Chapter 15: Building a Stack308 Section III: Building a Stack with VCStack Plus4. Do one of the following: If the SHOW STACK command is displaying al
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection III: Building a Stack with VCStack Plus 309Installing Optional Feat
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 31Table 2. AT-SBxPWRPOE1 Power Supply LEDsLE
Chapter 15: Building a Stack310 Section III: Building a Stack with VCStack PlusTroubleshooting the StackThe best way to determine if the switches are
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection III: Building a Stack with VCStack Plus 311enabled the feature on t
Chapter 15: Building a Stack312 Section III: Building a Stack with VCStack Plus
313Appendix ATechnical SpecificationsPhysical SpecificationsDimensions (W x D x H)Weight (Kilograms)Table 26. Product DimensionsAT-SBx8106 Chassis 4
Appendix A: Technical Specifications314AT-SBx81GP24 PoE Line Card 1.06 kg (2.34 lb)AT-SBx81GS24a SFP Line Card 1.06 kg (2.34 lb)AT-SBx81XS6 SFP+ Line
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation Guide315Environmental SpecificationsNoteThe acoustic noise was measured at 40° C
Appendix A: Technical Specifications316Power SpecificationsAC Voltage, Frequency Requirements (Volts, Hertz)CC Voltage RequirementsTypical power savin
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation Guide317Maximum power supply efficiency (based on 100V input voltage)Heat dissip
Appendix A: Technical Specifications318PoE ModeSafety and Electromagnetic Emissions CertificationsSafety and Electromagnetic Emissions:IEEE 802.3af Cl
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation Guide319Port PinoutsThis section has the pinouts for the ports on the AT-SBx81GT
Chapter 1: Chassis and Power Supplies32 Section I: Hardware OverviewAT-SBxPWRSYS1 DC Power SupplyThe AT-SBxPWRSYS1 DC Power Supply, shown in Figure 11
Appendix A: Technical Specifications320Table 42 lists the port pin signals when a 10/100/1000Base-T port is operating at 1000 Mbps.Table 42. 1000Bas
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation Guide321Fiber Optic Specifications of the AT-StackOP/0.3 and AT-StackOP/9.0 Tran
Appendix A: Technical Specifications322TransmitterWavelength 1310 nmOutput Optical Power -8.2 dBm min.+0.5 dBm max.ReceiverWavelength 1310 nmMaximum S
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 33NoteTo avoid installing both AC and DC power
Chapter 1: Chassis and Power Supplies34 Section I: Hardware OverviewAT-SBxFAN06 ModuleThe AT-SBxFAN06 Module, shown in Figure 12, is the cooling unit
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 35Power Supply Interfaces (Opto-couplers)The c
Chapter 1: Chassis and Power Supplies36 Section I: Hardware OverviewTable 5. Power Supply Interface LEDLED State DescriptionPowerSolid Green The int
37Chapter 2Ethernet Line CardsThis chapter describes the Ethernet line cards for the SwitchBlade x8106 Chassis Switch in the following sections: “Eth
Chapter 2: Ethernet Line Cards38 Section I: Hardware OverviewEthernet Line CardsThe Ethernet line cards are shown in Figure 14.Figure 14. Ethernet Lin
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 39AT-SBx81GT24 Line CardThe AT-SBx81GT24 Line
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation Guide4Translated Safety StatementsImportant: The indicates that a translation
Chapter 2: Ethernet Line Cards40 Section I: Hardware OverviewFigure 16. Port LEDs on the AT-SBx81GT24 Line CardTable 6. Port LEDs on the AT-SBx81GT2
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 41AT-SBx81GT40 Line CardThe AT-SBx81GT40 Line
Chapter 2: Ethernet Line Cards42 Section I: Hardware OverviewLEDs The LEDs for a port on the AT-SBx81GT40 Line Card are found on the RJ point 5 cable
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 43Table 7. Port LEDs on the AT-SBx81GT40 Lin
Chapter 2: Ethernet Line Cards44 Section I: Hardware OverviewAT-SBx81GP24 PoE Line CardThe AT-SBx81GP24 PoE Line Card, shown in Figure 20, is a Gigabi
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 45LEDs Each port on the AT-SBx81GP24 PoE Line
Chapter 2: Ethernet Line Cards46 Section I: Hardware OverviewPoE Off This LED state can result from the following conditions: The port is not connect
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 47AT-SBx81GS24a SFP Line CardThe AT-SBx81GS24a
Chapter 2: Ethernet Line Cards48 Section I: Hardware OverviewFigure 23. Port LEDs on the AT-SBx81GS24a SFP Line CardTable 9. Port LEDs on the AT-SBx
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 49AT-SBx81XS6 SFP+ Line CardThe AT-SBx81XS6 Li
5Preface ...
Chapter 2: Ethernet Line Cards50 Section I: Hardware OverviewTable 10. SFP+ Slot LEDs on the AT-SBx81XS6 Line CardLED State DescriptionL/ASolid Gree
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 51AT-SBx81XS16 SFP+ Line CardThe AT-SBx81XS16
Chapter 2: Ethernet Line Cards52 Section I: Hardware OverviewFigure 27. SFP+ Slot LEDS on the AT-SBx81XS16 Line CardTable 11. SFP+ Slot LEDs on the
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 5310/100/1000Base-T Twisted Pair PortsThis sec
Chapter 2: Ethernet Line Cards54 Section I: Hardware OverviewCableRequirementsThe cable requirements for the ports on the AT-SBx81GT24 and AT-SBx81GT4
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 55Automatic MDIXDetectionThe 10/100/1000 Mbps
Chapter 2: Ethernet Line Cards56 Section I: Hardware OverviewPower over Ethernet on the AT-SBx81GP24 Line CardThis section applies to the AT-SBx81GP24
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 57Power Budgeting The power for PoE on the por
Chapter 2: Ethernet Line Cards58 Section I: Hardware Overviewsupport PDs that receive power using Alternative A.PDs that comply with the IEEE 802.3af
59Chapter 3AT-SBx81CFC960 Controller Fabric CardThis chapter describes the AT-SBx81CFC960 Controller Fabric Card in the following sections: “Hardware
Contents6Power over Ethernet on the AT-SBx81GP24 Line Card... 56Powered
Chapter 3: AT-SBx81CFC960 Controller Fabric Card60 Section I: Hardware OverviewHardware ComponentsThe components on the controller card are identified
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 61Slots for 10Gbps SFP+ TransceiversSupports f
Chapter 3: AT-SBx81CFC960 Controller Fabric Card62 Section I: Hardware OverviewGuidelinesHere are a few functions of the controller card: Chassis Man
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 63controller card. The chassis may have eithe
Chapter 3: AT-SBx81CFC960 Controller Fabric Card64 Section I: Hardware OverviewDual Controller CardsYou may install either one or two controller cards
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 65One of the controller cards becomes the acti
Chapter 3: AT-SBx81CFC960 Controller Fabric Card66 Section I: Hardware OverviewSYS Status LEDsThe SYS (System) Status LEDs on the controller fabric ca
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 67FANSolid Green Indicates that the fan module
Chapter 3: AT-SBx81CFC960 Controller Fabric Card68 Section I: Hardware Overvieweco-friendly ButtonYou may use the eco-friendly button on the controlle
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 69SBx Linecard Status LEDsThe SBx Linecard Sta
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation Guide7Installing SFP+ Transceivers in the AT-SBx81XS16 Line Card ...
Chapter 3: AT-SBx81CFC960 Controller Fabric Card70 Section I: Hardware OverviewSFP+ SlotsThe controller card has four SFP+ slots on the front panel. T
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 71Table 19. LEDs for the SFP+ Slots on the AT-
Chapter 3: AT-SBx81CFC960 Controller Fabric Card72 Section I: Hardware OverviewConsole (RS-232) PortThe Console Port is used to conduct local manageme
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 73Ethernet Management Port (NET MGMT)The contr
Chapter 3: AT-SBx81CFC960 Controller Fabric Card74 Section I: Hardware OverviewTable 20. NET MGMT Port LEDLED State DescriptionL/ASolid Green The po
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 75USB PortThe USB port supports a flash drive.
Chapter 3: AT-SBx81CFC960 Controller Fabric Card76 Section I: Hardware OverviewReset ButtonYou may use the Reset button to reset either the controller
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection I: Hardware Overview 77NoteTo reset individual line cards in the ch
Chapter 3: AT-SBx81CFC960 Controller Fabric Card78 Section I: Hardware OverviewAlliedWare Plus Software Releases for the Hardware ComponentsTable 21 l
79Section IIInstalling the ChassisThis section contains the following chapters: Chapter 4, “Safety Precautions and Site Requirements” on page 81 Cha
Contents8Cabling Configurations for the Stacking Transceivers ... 273O
80
81Chapter 4Safety Precautions and Site RequirementsThis chapter contains the safety precautions and guidelines for selecting a site for the chassis. T
Chapter 4: Safety Precautions and Site Requirements82 Section II: Installing the ChassisReviewing Safety PrecautionsPlease review the following safety
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 83NotePluggable Equipment. The socket ou
Chapter 4: Safety Precautions and Site Requirements84 Section II: Installing the ChassisWarningMounting of the equipment in the rack should be such th
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 85WarningReliable earthing of rack-mount
Chapter 4: Safety Precautions and Site Requirements86 Section II: Installing the ChassisSelecting a Site for the SwitchBlade x8106Please perform the f
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 87Figure 29. 100 - 125 VAC 125 V NEMA 5-
Chapter 4: Safety Precautions and Site Requirements88 Section II: Installing the ChassisInstallation Tools and MaterialHere are the installation tools
89Chapter 5Installing the Chassis in an Equipment RackThis chapter describes how to install the AT-SBx8106 Chassis in an equipment rack. This chapter
9FiguresFigure 1: AT-SBx8106 Chassis ...
Chapter 5: Installing the Chassis in an Equipment Rack90 Section II: Installing the ChassisRequired Tools and MaterialHere is a list of the tools and
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 91Preparing the Equipment RackThis secti
Chapter 5: Installing the Chassis in an Equipment Rack92 Section II: Installing the ChassisFigure 30. Reserving Vertical Rack Space190.0 mm (7.5“)152.
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 933. Identify the lowest 1/2” screw hole
Chapter 5: Installing the Chassis in an Equipment Rack94 Section II: Installing the ChassisUnpacking the AT-SBx8106 ChassisTo unpack the AT-SBx8106 Ch
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 95Figure 33. Components of the AT-SBx810
Chapter 5: Installing the Chassis in an Equipment Rack96 Section II: Installing the ChassisRemoving the Rubber FeetThe chassis comes with rubber feet
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 97Figure 35. Removing the Rubber Feet3.
Chapter 5: Installing the Chassis in an Equipment Rack98 Section II: Installing the ChassisAdjusting the Equipment Rack BracketsThe chassis has two pr
SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation GuideSection II: Installing the Chassis 99Figure 36. Rack Mounting Bracket Locat
Comments to this Manuals