Chapter 2: Installation
34
Unpacking the Switch
To unpack the switch, perform the following procedure:
1. Remove all of the components from the shipping package.
Note
Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesis.
2. Place the switch on a level, secure surface.
3. In addition to an AT-GS950/10PS, AT-GS950/16PS, or AT-GS950/
48PS switch, verify that the shipping container includes the following
items shown in Figure 18 on page 35.