Allied Telesis AT-x230-10GP Installation Guide Page 55

  • Download
  • Add to my manuals
  • Print
  • Page
    / 80
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 54
AT-x230-10GP and AT-x230-18GP Switches Installation Guide
45
Installing an AT-x230-18GP switch in an equipment rack
These instructions show you how to install an AT-x230-18GP switch in an
equipment rack. Rack mount kits for the AT-x230-18GP switch, AT-RKMT-
J13, can be purchased separately from your Allied Telesis dealer.
To install an AT-x230-18GP switch in a 19-inch equipment rack, follow
these steps:
1. If rubber feet are attached to the base of the switch, place the unit
upside down on a level, secure surface.
2. Remove the rubber feet with a screwdriver (Figure 18).
FIGURE 18. REMOVING THE RUBBER FEET FROM A SWITCH
x230-10GP
CONSOLE
RS-232
SD
FAULT
POWER
SD
1000 LINK ACT 10/100 LINK ACT PD ON PD ERR MAX CURRENT
SFP
9
10
24 68
1357
MAC Address Label
3. Turn the switch back over.
Page view 54
1 2 ... 50 51 52 53 54 55 56 57 58 59 60 ... 79 80

Comments to this Manuals

No comments