Allied Telesis AT-x230-10GP Installation Guide Page 52

  • Download
  • Add to my manuals
  • Print
  • Page
    / 80
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 51
Chapter 2: Installation
42
Installing an AT-x230-10GP switch in an equipment rack
These instructions show you how to install an AT-x230-10GP switch in an
equipment rack. Rack mount kits for the AT-x230-10GP switch, AT-
RKMT-J14, can be purchased separately from your Allied Telesis dealer.
To install an AT-x230-10GP switch in a 19-inch equipment rack, follow
these steps:
1. If rubber feet are attached to the base of the switch, place the unit
upside down on a level, secure surface.
2. Remove the rubber feet with a screwdriver (Figure 15).
FIGURE 15. REMOVING THE RUBBER FEET FROM A SWITCH
x230-10GP
CONSOLE
RS-232
SD
FAULT
POWER
SD
1000 LINK ACT 10/100 LINK ACT PD ON PD ERR MAX CURRENT
SFP
9
10
24 68
1357
MAC Address Label
3. Turn the switch back over.
Page view 51
1 2 ... 47 48 49 50 51 52 53 54 55 56 57 ... 79 80

Comments to this Manuals

No comments